Short Run Pro's normal lead time is 5 business days to make your product. Please
add 5 days to normal lead time for powder coat paint, black oxide and zinc plating
services. If you need the part sooner, the order may be able to be expedited (based upon production schedule) for an additional
cost. Our capabilities run from production of small runs (including 1 part) or large
production runs of thousands of metal parts.
We keep bracket designs on file in our database so you can access the drawing
in the future. Short Run Pro also will archive your drawing for use and reference
in OEM engineering prints and the software used on Short Run Pro is compatible with
most engineering drawing formats. Short Run Pro reserve the right to revise and modify drawings for future projects.