Request a Quote

Customer Information


Product Information


Standard Short Run Product Materials:

Stainless Steel (up to 1/4 inch) - Premium material with excellent corrosion resistance and strength.

Cold Rolled Steel (up to 1/2 inch) - Inexpensive material. Structurally strong, but subject to corrosion in most environments.

Galvanized Steel (up to 11 gauge) - Slightly more expensive than Cold Rolled Steel but with a zinc coating which provides corrosion resistance.

Aluminum (up to 1/4) - Lightweight material, mill finish, corrosion resistance with lighter carrying capacity.

Powder coat paint finishes are available at an additional cost. This finish will act as a corrosion prohibitive on the surfaces covered and provide an aesthetic finish.


Up to 3 files of maximum 2MB per file can be uploaded

0%
Up to 3 files can be uploaded


Guidelines

  • When determining Order Quantity please also consider whether a prototype run is desire for approval purposes.
  • If part(s) will be reordered please provide estimated annual usage along with production run quantity.
  • Provide part usage description in "Product in Detail" field along with any other important information related to the part.
  • Drawing file formats accepted include: JPEG, PDF, IGS, DXF, DOC,TIF, PNG. PDF is preferred format for estimation.
  • In order to expedite your price quote please ensure that any drawing submitted includes all dimensional information on the part. Material thickness should also be noted in the "Material", "Product in Detail" fields or on the submitted drawings.

Tips

  • If you are unsure of your material selection, it will help if you provide a detailed description of the part use. Check out our resources on materials for details about the different characteristics of materials manufactured.
  • Include as much information as available. Our estimation team can process your quote expeditiously without unnecessary delay if all necessary information on the part is submitted.
  • Lead times may vary based on process requirements and cyclical production schedules. Our website, quoting forms and other business materials may specify a lead time. However, the most accurate available timing for production runs will be specified by our production staff when your job is entered onto the production floor.

Menu

Settings